Video coating system:

https://drive.google.com/file/d/1p_T5EK-tRFME22S9jIFcXFzS5Jha3b4i/view?usp=sharing


Preliminary Inspection

Before starting the work, inspect the roof for any damage. It is important to identify defects in advance that cannot be addressed at later stages. Detailed information on how to inspect the roof is provided.: RV Roof Inspection

<aside> đź’ˇ

If any unplanned repairs are identified, inform the company office so the PM can discuss them with the client. Additional work can only begin after it has been approved.

</aside>


Cleaning the work surface

<aside> đź’ˇ

<aside> đź’ˇ

Remember or take pictures of the location and method of fastening of all removed elements to make it easier to reinstall them once the work is completed. Store the removed elements in a safe place to prevent any damage.

</aside>


Checking problem areas


Removal of old sealant


Covering masking tape:

<aside> đź’ˇ

When coating 1,2 layers we do not have to glue masking tape on the membrane as the whole roof will be covered with silicone.

</aside>


Primer preparation